{"id":13550,"date":"2025-12-22T15:50:30","date_gmt":"2025-12-22T08:50:30","guid":{"rendered":"https:\/\/mpcovn.com\/ho-so-nang-luc\/110kv-50mvar-capacitor-bank-at-thanh-nghi-220kv-substation\/"},"modified":"2026-04-13T13:37:09","modified_gmt":"2026-04-13T06:37:09","slug":"110kv-50mvar-capacitor-bank-at-thanh-nghi-220kv-substation","status":"publish","type":"portfolio","link":"https:\/\/mpcovn.com\/en\/ho-so-nang-luc\/110kv-50mvar-capacitor-bank-at-thanh-nghi-220kv-substation\/","title":{"rendered":"110kV, 50MVAR Capacitor Bank at Thanh Nghi 220kV Substation"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_gallery type=&#8221;flexslider_slide&#8221; interval=&#8221;3&#8243; images=&#8221;13552,13553,13554,13551&#8243; img_size=&#8221;full&#8221; css=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text css=&#8221;&#8221; woodmart_inline=&#8221;no&#8221; text_larger=&#8221;no&#8221;]<span style=\"font-weight: 400;\">On April 19, 2025, My Phuong Trading Co., Ltd. (MPCo)<\/span> successfully completed the acceptance and energization of the <span style=\"font-weight: 400;\">110kV, 50MVAr capacitor bank at Thanh Nghi 220kV Substation (Ha Nam Province),<\/span> under Package No. 3: Supply and Delivery of Primary Equipment issued by the <span style=\"font-weight: 400;\">Power Transmission Project Management Board of Vietnam.<\/span><\/p>\n<div id=\"attachment_11834\" style=\"width: 1210px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-11834\" class=\"wp-image-11834 size-full\" src=\"https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-04.jpg\" alt=\"Energization Project of the 110kV, 50MVAr Capacitor Bank at Thanh Nghi 220kV Substation | My Phuong 04\" width=\"1200\" height=\"688\" srcset=\"https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-04.jpg 1200w, https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-04-400x229.jpg 400w, https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-04-768x440.jpg 768w, https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-04-430x247.jpg 430w, https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-04-700x401.jpg 700w, https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-04-150x86.jpg 150w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><p id=\"caption-attachment-11834\" class=\"wp-caption-text\"><em>Project for Energization of the 110kV, 50MVAr Capacitor Bank at Thanh Nghi 220kV Substation<\/em><\/p><\/div>\n<h2><strong>Project Information<\/strong><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Project Name<\/b>: Thanh Nghi 220kV Substation<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Investor: <\/b>Power Transmission Project Management Board \u2013 A Branch of the National Power Transmission Corporation (EVNNPT)<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Location: <\/b>Thanh Nghi Commune, Thanh Liem District, Ha Nam Province<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Implementation Period:<\/b> November 2024 \u2013 April 2025<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The capacitor bank is manufactured by Eaton\u2019s Cooper, a brand with over 80 years of experience in the electrical equipment industry. It utilizes internally fused capacitor units of the EX-7Li type, with a rated voltage of 15kV and a capacity of 565 kVAr per unit, with a total of 120 units (50MVAr per bank). <\/span><\/p>\n<div id=\"attachment_11835\" style=\"width: 1210px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-11835\" class=\"wp-image-11835 size-full\" src=\"https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-05.jpg\" alt=\"Energization Project of the 110kV, 50MVAr Capacitor Bank at Thanh Nghi 220kV Substation | My Phuong 05\" width=\"1200\" height=\"688\" srcset=\"https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-05.jpg 1200w, https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-05-400x229.jpg 400w, https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-05-768x440.jpg 768w, https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-05-430x247.jpg 430w, https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-05-700x401.jpg 700w, https:\/\/mpcovn.com\/wp-content\/uploads\/2025\/12\/du-an-dong-dien-gian-tu-bu-110kv-50mvar-tai-tram-bien-ap-220kv-thanh-nghi-my-phuong-05-150x86.jpg 150w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><p id=\"caption-attachment-11835\" class=\"wp-caption-text\"><em>Successfully Completed Another Key Power Infrastructure Project at Nghi Son 220kV Substation<\/em><\/p><\/div>\n<p><span style=\"font-weight: 400;\">The commissioning of the capacitor bank contributes to maintaining transmission grid voltage in the Northern region within permissible limits, meeting the increasing power demand of critical loads. It also enhances the stability of power supply, reduces power and energy losses, and thereby improves the operational and business efficiency of Vietnam Electricity (EVN).<\/span>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_gallery type=&#8221;flexslider_slide&#8221; interval=&#8221;3&#8243; images=&#8221;13552,13553,13554,13551&#8243; img_size=&#8221;full&#8221; css=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text css=&#8221;&#8221; woodmart_inline=&#8221;no&#8221; text_larger=&#8221;no&#8221;]On April 19, 2025, My Phuong Trading Co., Ltd. (MPCo) successfully completed<\/p>\n","protected":false},"featured_media":13557,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","project-cat":[460],"class_list":["post-13550","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","project-cat-2025-to-present"],"acf":[],"_links":{"self":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/portfolio\/13550","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"replies":[{"embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/comments?post=13550"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/media\/13557"}],"wp:attachment":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/media?parent=13550"}],"wp:term":[{"taxonomy":"project-cat","embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/project-cat?post=13550"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}