{"id":13624,"date":"2017-02-24T13:58:52","date_gmt":"2017-02-24T06:58:52","guid":{"rendered":"https:\/\/mpcovn.com\/ho-so-nang-luc\/110-kv-capacitor-bank-on-the-northern-transmission-grid-evnnpt\/"},"modified":"2026-04-13T16:01:18","modified_gmt":"2026-04-13T09:01:18","slug":"110-kv-capacitor-bank-on-the-northern-transmission-grid-evnnpt","status":"publish","type":"portfolio","link":"https:\/\/mpcovn.com\/en\/ho-so-nang-luc\/110-kv-capacitor-bank-on-the-northern-transmission-grid-evnnpt\/","title":{"rendered":"110 kV capacitor bank on the Northern transmission grid (EVNNPT)"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221; woodmart_inline=&#8221;no&#8221; text_larger=&#8221;no&#8221;]<\/p>\n<h2><strong>Project Information<\/strong><\/h2>\n<ul>\n<li aria-level=\"1\"><b>Project Name:<\/b> Installation of shunt capacitor banks on the Northern power transmission grid (EVNNPT)<\/li>\n<li aria-level=\"1\"><strong>Investor:<\/strong> Vietnam National Power Transmission Corporation (EVNNPT)<br \/>\n<strong>Project Management Unit:<\/strong> Power Transmission Company No. 1 (PTC1)<\/li>\n<li aria-level=\"1\"><strong>Locations:<\/strong><\/li>\n<\/ul>\n<p>220 kV Phu Ly Substation (Ha Nam Province)<br \/>\n220 kV Kim Dong Substation (Hung Yen Province)<br \/>\n500 kV Thuong Tin Substation (Hanoi)<br \/>\n220 kV Ba Che Substation (Thanh Hoa Province)<br \/>\n220 kV Bim Son Substation (Thanh Hoa Province)<\/p>\n<ul>\n<li aria-level=\"1\"><strong>Implementation period:<\/strong> 2017<\/li>\n<\/ul>\n<p>In July 2017, My Phuong Company supplied six 110 kV capacitor banks manufactured by Eaton\u2019s Cooper for the project \u201cInstallation of shunt capacitor banks on the Northern power transmission grid,\u201d which is invested by EVNNPT and directly managed by PTC1.<\/p>\n<p>The capacitor banks, manufactured by Eaton\u2019s Cooper\u2014an electrical equipment manufacturer with more than 80 years of experience\u2014use lead-free EX-7L capacitor units with a rated voltage of 15 kV and a capacity of 565 kVAr. Each bank consists of a total of 132 units, corresponding to 74.5 MVAr per bank.<\/p>\n<p>The commissioning of the capacitor bank contributes to maintaining transmission grid voltage in the Northern region within permissible limits, meeting the increasing power demand of critical loads. It also enhances the stability of power supply, reduces power and energy losses, and thereby improves the operational and business efficiency of Vietnam Electricity (EVN).[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221; woodmart_inline=&#8221;no&#8221; text_larger=&#8221;no&#8221;] Project Information Project Name: Installation of shunt capacitor banks on the Northern power transmission grid (EVNNPT)<\/p>\n","protected":false},"featured_media":13625,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","project-cat":[465],"class_list":["post-13624","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","project-cat-before-2020"],"acf":[],"_links":{"self":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/portfolio\/13624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"replies":[{"embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/comments?post=13624"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/media\/13625"}],"wp:attachment":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/media?parent=13624"}],"wp:term":[{"taxonomy":"project-cat","embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/project-cat?post=13624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}