{"id":13704,"date":"2014-02-10T10:04:20","date_gmt":"2014-02-10T03:04:20","guid":{"rendered":"https:\/\/mpcovn.com\/ho-so-nang-luc\/capacitor-bank-at-110-kv-quy-hop-substation\/"},"modified":"2026-04-14T10:22:17","modified_gmt":"2026-04-14T03:22:17","slug":"capacitor-bank-at-110-kv-quy-hop-substation","status":"publish","type":"portfolio","link":"https:\/\/mpcovn.com\/en\/ho-so-nang-luc\/capacitor-bank-at-110-kv-quy-hop-substation\/","title":{"rendered":"Capacitor Bank at 110 kV Quy Hop Substation"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_gallery interval=&#8221;3&#8243; images=&#8221;13707,13705,13706&#8243; img_size=&#8221;full&#8221; css=&#8221;&#8221;][vc_column_text css=&#8221;&#8221; woodmart_inline=&#8221;no&#8221; text_larger=&#8221;no&#8221;]<\/p>\n<h2><strong>Project Information<\/strong><\/h2>\n<ul>\n<li aria-level=\"1\"><strong>Project Name:<\/strong> Capacitor Bank at 110 kV Quy Hop Substation<\/li>\n<li aria-level=\"1\"><strong>Investor:<\/strong> Northern High Voltage Power Network Company<\/li>\n<li aria-level=\"1\"><strong>Location:<\/strong> Quy Hop District, Nghe An Province<\/li>\n<li aria-level=\"1\"><strong>Implementation Period:<\/strong> 2014<\/li>\n<\/ul>\n<p>To reduce power losses and improve voltage quality, the Northern High Voltage Power Network Company implemented the installation of medium-voltage capacitor banks at 110 kV substations under its management. Quy Hop 110 kV Substation is the first substation to be equipped with a 35 kV capacitor bank with a capacity of 5 MVAr.<\/p>\n<p>The capacitor bank, manufactured by Eaton\u2019s Cooper\u2014an electrical equipment manufacturer with over 80 years of experience\u2014uses lead-free EX-7L capacitor units, with a rated voltage of 14.127 kV and a capacity of 254 kVAr each, totaling 30 units (5 MVAr per bank).<\/p>\n<p>The substation was commissioned in 1990 and is currently equipped with a 25 MVA transformer (110\/38.5\/11 kV), supplying power to 35 kV and 10 kV loads in Quy Hop, Quy Chau, and Que Phong districts.<\/p>\n<p>The installation of the capacitor bank helps to:<\/p>\n<p>. Provide reactive power support Stabilize voltage quality during peak hours Ensure safe, stable, and reliable operation of the power grid[\/vc_column_text][\/vc_column][vc_column][\/vc_column][vc_column][\/vc_column][vc_column][\/vc_column][vc_column][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_gallery interval=&#8221;3&#8243; images=&#8221;13707,13705,13706&#8243; img_size=&#8221;full&#8221; css=&#8221;&#8221;][vc_column_text css=&#8221;&#8221; woodmart_inline=&#8221;no&#8221; text_larger=&#8221;no&#8221;] Project Information Project Name: Capacitor Bank at 110 kV Quy Hop Substation<\/p>\n","protected":false},"featured_media":13705,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","project-cat":[465],"class_list":["post-13704","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","project-cat-before-2020"],"acf":[],"_links":{"self":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/portfolio\/13704","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"replies":[{"embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/comments?post=13704"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/media\/13705"}],"wp:attachment":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/media?parent=13704"}],"wp:term":[{"taxonomy":"project-cat","embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/project-cat?post=13704"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}