{"id":13501,"date":"2023-09-12T17:30:18","date_gmt":"2023-09-12T10:30:18","guid":{"rendered":"https:\/\/mpcovn.com\/chua-phan-loai\/training-on-installation-and-operation-of-capacitor-switches-and-control-panels-at-tra-vinh-power-company\/"},"modified":"2023-09-12T17:30:18","modified_gmt":"2023-09-12T10:30:18","slug":"training-on-installation-and-operation-of-capacitor-switches-and-control-panels-at-tra-vinh-power-company","status":"publish","type":"post","link":"https:\/\/mpcovn.com\/en\/news\/training-on-installation-and-operation-of-capacitor-switches-and-control-panels-at-tra-vinh-power-company\/","title":{"rendered":"Training on Installation and Operation of Capacitor Switches and Control Panels at Tra Vinh Power Company"},"content":{"rendered":"<p>Based on the signed contract between Tra Vinh Power Company and My Phuong Company, after completing the delivery, on September 12, 2023, the technical team of My Phuong Company conducted a training session on the installation and operation of capacitor switches and control panels for the technical staff of Tra Vinh Power Company.<br \/>The training session was held at the office of Tra Vinh Power Company with the full and enthusiastic participation of the technical staff.<br \/>During the session, technical teams from both sides engaged in hands-on discussions using the actual equipment.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-12787 size-full\" src=\"https:\/\/mpcovn.com\/wp-content\/uploads\/2026\/03\/58.png\" alt=\"\" width=\"1201\" height=\"742\" srcset=\"https:\/\/mpcovn.com\/wp-content\/uploads\/2026\/03\/58.png 1201w, https:\/\/mpcovn.com\/wp-content\/uploads\/2026\/03\/58-400x247.png 400w, https:\/\/mpcovn.com\/wp-content\/uploads\/2026\/03\/58-768x474.png 768w, https:\/\/mpcovn.com\/wp-content\/uploads\/2026\/03\/58-430x266.png 430w, https:\/\/mpcovn.com\/wp-content\/uploads\/2026\/03\/58-700x432.png 700w, https:\/\/mpcovn.com\/wp-content\/uploads\/2026\/03\/58-150x93.png 150w\" sizes=\"auto, (max-width: 1201px) 100vw, 1201px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Based on the signed contract between Tra Vinh Power Company and My Phuong Company, after completing the delivery, on September<\/p>\n","protected":false},"author":7,"featured_media":13502,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[570,567],"tags":[],"class_list":["post-13501","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/posts\/13501","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/comments?post=13501"}],"version-history":[{"count":0,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/posts\/13501\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/media\/13502"}],"wp:attachment":[{"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/media?parent=13501"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/categories?post=13501"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mpcovn.com\/en\/wp-json\/wp\/v2\/tags?post=13501"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}