Capacitor Bank at Son Tay 110kV Substation

Project Information

Son Tay 110kV Substation

Time Period

March 2026 – April 2026

Client

Hanoi High Voltage Grid Company

Location

Thanh My Commune, Son Tay Town, Hanoi City









    On April 29, 2026, My Phuong Trading Co., Ltd. (MPCo) successfully completed the acceptance testing and energization of the capacitor bank at Son Tay 110kV Substation, under Package No. 3: Supply of 110kV shunt capacitor banks, including installation, connection, and system completion at 110kV substations, invested by Hanoi High Voltage Grid Company.

    The project was implemented on schedule, fully meeting the technical requirements of the power sector, contributing to improved power quality, enhanced power factor, and voltage stability within the substation’s operating area.

    Project Information

    Project Name: Son Tay 110kV Substation
    Investor: Hanoi High Voltage Grid Company
    Location: Thanh My Commune, Son Tay Town, Hanoi City
    Implementation Period: March 2026 – April 2026

    The capacitor bank system is manufactured by Eaton’s Cooper, a world-leading brand with 80 years of experience in capacitor manufacturing. The project uses EX-7L single-phase, two-bushing medium-voltage capacitor units, with a rated voltage of 15kV and a capacity of 565kVAr.

    The commissioning of the capacitor bank system brings the following benefits:

    • Improve reactive power compensation capability for the regional power grid.
    • Improve power factor and power quality.
    • Stabilize the operating voltage at Son Tay 110kV Substation.
    • Reduce power losses on the grid.
    • Improve operational efficiency and enhance power supply reliability for electricity customers in the area.

    The successful completion and commissioning of the project have contributed to improving the operational efficiency of the power system, meeting socio-economic development needs, and ensuring a safe and stable power supply for Son Tay and surrounding areas.