Xây dựng Trung tâm Điều khiển trạm 110 kV không người trực tại Điện Lực Khánh Hòa

Construction of an unmanned 110 kV Substation Control Center for EVNCPC

Tên dự án

Construction of an Unmanned 110 kV Substation Control Center at Khanh Hoa Power Company (EVNCPC)

Thời gian

2016

Chủ đầu tư

Khanh Hoa Power Joint Stock Company

Địa điểm

Khanh Hoa Province









    Project Information

    • Project Name: Construction of an Unmanned 110 kV Substation Control Center at Khanh Hoa Power Company (EVNCPC)
    • Investor: Khanh Hoa Power Joint Stock Company
    • Location: Khanh Hoa Province
    • Implementation period: 2016

    In the fourth quarter of 2016, My Phuong Company collaborated with the Telecommunication and Information Technology Center – a subsidiary of the Vietnam Electricity Group (EVN) – to implement a project to build a Control Center (CC) for unmanned 110 kV substations at Khanh Hoa Power Joint Stock Company, using SCADA software from Survalent (Canada).

    The project was implemented with the objective of centralizing the monitoring, control, and operation of the power grid. The Survalent SCADA system integrates all signals from unmanned 110 kV substations and medium-voltage network equipment through international standard communication protocols such as IEC 60870-5-101, IEC 60870-5-104, and DNP3.0.

    With close coordination among all participating parties, the project was implemented and completed on schedule, officially put into operation in the first quarter of 2017. By 2018, the Khanh Hoa Control Center had established SCADA connectivity and remote control for seven 110 kV substations and more than 100 medium-voltage grid devices, contributing to improved power supply reliability, optimized system operation, and the gradual modernization of the power grid in Khanh Hoa Province.