Dự Án Đóng Điện Giàn Tụ Bù 110KV, 50MVAR Tại Trạm Biến Áp 220KV Hải Hà| Mỹ Phương

Capacitor Bank at Hai Ha 220kV Substation

Tên dự án

Hai Ha 220kV Substation

Thời gian

November 2024 – April 2025

Chủ đầu tư

National Power Transmission Corporation (EVNNPT)

Địa điểm

Quang Ninh Province









    On April 28, 2024, the Hai Ha 220kV Substation (Quang Ninh Province), under Package No. 5: Supply and Delivery of Primary Equipment for the 2024 Northern Power Transmission Capacitor Installation Project, was successfully commissioned, with the capacitor bank officially energized and put into operation.

    Project Information

    • Project Name: Hai Ha 220kV Substation
    • Investor: National Power Transmission Corporation (EVNNPT)
    • Location: Quang Ninh Province
    • Implementation Period: November 2024 – April 2025

    The capacitor bank is manufactured by Eaton’s Cooper, a brand with over 80 years of experience in the electrical equipment industry. It utilizes internally fused capacitor units of the EX-7Li type, with a rated voltage of 15kV and a capacity of 565 kVAr per unit, totaling 60 units.
    The commissioning of the capacitor bank contributes to maintaining transmission grid voltage in the Northern region within permissible limits, meeting the increasing power demand of critical loads. It also enhances the stability of power supply, reduces power and energy losses, and thereby imp